Abstract:To meet the requirements of the hydrocarbon exploration and development in Tuha Basin,seismic data should be well processed and its quality should be much improved.For this purpose we use GeoEast target-oriented processing technology to process seismic data of some surveys in Tuha Basin,which includes mainly combined static corrections,combined de-noising approaches to improve the signal-to-noise ratio (SNR),combined deconvolutions to improve data resolution,and prestack time migration (PSTM).Then we adopt integrated processing and interpretation approaches.Finally we carry out reservoir identification and provide well deployment proposal for the future exploration.
刘治凡.基于浮动基准面的两步法静校正.石油物探,1998,37(1):136-142.Liu Zhifan.Two-step static correction based on floating datum.GPP,1998,37(1):136-142.
[4]
李卫忠,Saleh A.Al-Maghlouth, Adnan Hashem等.基于模型的复杂地表区静校正方法.石油地球物理勘探,2010,45(6):797-801.Li Weizhong,Saleh A.Al-Maghlouth,Adnan Hashem et al.Model-based static correction method in complicated terrain areas.OGP,2010,45(6):797-801.
[5]
谢练兵,曾天玖,于庆馨等.复杂地表低信噪比资料处理的关键技术探讨.物探技术研讨会议,2017.
[6]
苑益军,周芝旭,牛滨华等.浅谈地震资料处理中的提高信噪比处理技术.石油地球物理勘探,2005,40(2):168-171.Yuan Yijun,Zhou Zhixu,Niu Binhua et al.Briefly talk about processing techniques of improving S/N ratio in seismic data processing.OGP,2005,40(2):168-171.
[7]
刘明乾,于相海,周夏丽等.非纵测线地震资料相干噪声压制.石油物探,2011,50(3):307-309.Liu Mingqian,Yu Xianghai,Zhou Xiali et al.Coherent noise attenuation in broadside seismic data.GPP,2011,50(3):307-309.
[8]
严又生.一种非线性滤波去噪方法.石油地球物理勘探,1998,33(1):104-108.Yan Yousheng.A new method of nonlinear filtering noise removal.OGP,1998,33(1):104-108.
[9]
宋玉琢,王维红,初海红等.GeoEast保幅处理技术在大庆油田龙26区块的应用.石油地球物理勘探,2014,49(增刊1):41-47.Song Yuzhuo,Wang Weihong,Chu Haihong et al.GeoEast's amplitude preservation processing in Block Long 26,Daqing Oilfield.OGP,2014,49(Supplement 1):41-47.
[10]
凌云.大地吸收衰减分析.石油地球物理勘探,2001,36(1):1-8.Ling Yun.Analysis of attenuation by earth obsorption.OGP,2001,36(1):1-8.
[11]
王兴,曾庆才,陈猛等.GeoEast井控地震资料处理效果分析,石油地球物理勘探,2014,49(增刊 1):11-16.Wang Xing,Zeng Qingcai,Chen Meng et al.Well-control seismic data processing in ZG area with GeoEast.OGP,2014,49(Supplment 1):11-16.
[12]
郭建,王咸彬,胡中平等.Q 补偿技术在提高地震分辨率中的应用——以准噶尔盆地Y1井区为例.石油物探,2007,46(5):509-513.Guo Jian,Wang Xianbin,Hu Zhongping et al.Application of Q-compensation technique in improving seismic resolution:case study of Y1 well area.GPP,2007,46(5):509-513.
[13]
金守利,钱忠平,王成祥.GeoEast叠前时间偏移处理技术及应用,石油地球物理勘探,2014,49(增刊1):82-86.Jin Shouli,Qian Zhongping,Wang Chengxiang.GeoEast prestack time migration processing technique and application.OGP,2014,49(Supplement 1):82-86.
[14]
吕焕通,吴永强,高奇等.准噶尔盆地南缘下组合复杂构造地震成像技术效果.新疆石油地质,2012,33(5):586-588.Lü Huantong,Wu Yongqiang,Gao Qi et al.Seismic imaging effect of lower combination complex structures in southern margin of Junggar Basin.Xinjiang Petroleum Geology,2012,33(5):586-588.
[15]
林娟,罗勇,张龙等.GeoEast 处理系统在准南复杂高陡构造地区的应用.石油地球物理勘探,2014,49(增刊1):60-65.Lin Juan,Luo Yong,Zhang Long et al.GeoEast seismic data processing in complex steep structure areas,Junggar Basin.OGP,2014,49(Supplment 1):60-65.